What is the standard of glass door installation construction?

[China Glass Net] After the glass door material is transported to the site, all materials should be inspected, meet the design requirements, check whether the glass door size is consistent, and the diagonal deviation should not be greater than 1mm door clamp, floor spring, handle specification model If the correct accessories are complete, after inspection, they should be kept in a safe place and covered.

Glass door clamp installation: The installation of the lower door clamp should be carried out in advance according to the actual construction temperature of the weather (the gelation time is three days in summer and five days in winter), and the glass door fan is placed on a safe and firm object prepared in advance. Cover the blanket on the fixture, and keep the blanket clean. After the glass is scratched, put the glass glue into the lower door clip with a glass glue gun. To improve the installation quality, the glass glue hardens quickly. You can put the plywood on both sides of the lower door clamp at the same time. Or you should pay attention to the fullness of the plywood, but do not avoid waste. After the glue is finished, the lower door clamp is installed, and the action is light and stable during installation, and the door clamp is installed in place. Immediately after installation, the glass automatic door should be inspected and corrected. After the correction is passed, it can be fixed with a small wooden wedge so that it will not be deformed. At the same time, the F20 of the upper door clip is pre-assembled and the handle hole is well laid. The glass door is installed on the glass to accurately mark the installation position and the punching position. After removing the excess part, the hand drill and the 18 glass drill bit are aligned with the punching position for punching, and the punching should be light and stable. Do not press down until it is so transparent that the glass in the perforated area will be intact.

Floor spring installation: After the window glass or other door frame is completed, the ground spring can be installed. According to the position of the upper door clamp axis, the ground is vertically led to the ground, and the ground spring position line is accurately drawn according to the size of the floor spring. Use a marble machine to flow down the pit, open it clean and water it, mix 1:2 cement mortar into the pit, place the spring on the pit mortar, gently tap the rubber hammer until it is installed. Position, the installed floor spring should be coaxial with the upper door clamp and ensure vertical, cover protection after installation, and the door leaf can be installed after the mortar is hardened.

Glass door installation: Remove the door clamp pre-installed on the door leaf and place the door leaf on the floor spring. And with two frames and glass on a flat surface, after installing the door leaf, insert the F30-F40 door clamp door shaft into the upper door clamp bushing, and reinstall the upper door clamp on the glass door leaf. After installation, adjust and switch flexibly. After adjustment, the glass glue that overflows the door clamp and the small wooden wedge are cut flat with the glass knife than the upper end of the lower door clamp. Do not allow the glue to protrude out of the door clamp, clean it and re-glue it for decoration.

Glass door installation acceptance criteria

The thickness of the glass is generally 12 mm thick. Glass door diagonal deviation <1mm.

The hanging vertical line measures the verticality of the glass to ensure that the vertical does not allow deviation.

The edge of the door shall be straight, smooth and free of roughness. The door without any special instructions shall be completely edging.

The door leaf is flexible to open, and there is no card or smashing phenomenon.